Innerbanner

Project

Innerbanner

Project

Innerbanner

Project

Innerbanner

Project

Food & Beverages

  • manpasand_beverages
  • manpasand_beverages
  • laxmi
  • Manpasand Beverages Pvt. Ltd.

    Sector

    Food & Beverages

    Time Taken To Complete

    6 Months

    Total Construction Area

    1,23,087 Sq.Ft.

    Location

    Manjusar GIDC, Savli, Vadodara, Gujarat

  • Manpasand Beverages Pvt. Ltd.

    Sector

    Food & Beverages

    Time Taken To Complete

    6 Months

    Total Construction Area

    1,28,990 Sq.Ft.

    Location

    Ambala, Haryana

  • Laxmi Protein Products Pvt. Ltd.

    Sector

    Food & Beverages

    Time Taken To Complete

    7 Months

    Total Construction Area

    1,13,211 Sq.Ft.

    Location

    Vasad, Anand, Gujarat

  • Copyright © 2022 Adroit Structural Engineers Pvt. Ltd. All rights are reserved

  • Website Designed By : Megh Technologies